
Installing a modular kitchen is a major home upgrade, and knowing the modular kitchen installation time helps you plan better. A modular kitchen is not just about design; it also includes measurements, material selection, fabrication, and installation.
In this guide, we will explain the complete step-by-step process and timeline of modular kitchen installation. This will help you understand what happens at each stage and how long it usually takes.
Consultation & Site Measurement Timeline
The first step is to schedule a consultation with a modular kitchen expert. During this stage, the designer visits your home, measures the space, and understands your needs.
What happens:
- Measurements of kitchen area
- Discussion of layout and storage needs
- Material and finish selection
- Budget planning
Time required: 1–2 days
Design Finalization & Approval Stage (2–4 Days)
After measurement, the designer creates a 3D layout and design plan for your kitchen. You review the design and suggest changes if needed.
What happens:
- 3D kitchen design
- Layout adjustments
- Final approval
- Material confirmation
Time required: 2–4 days
Manufacturing & Fabrication (7–12 Days)
This stage plays a major role in the overall modular kitchen installation time, as all kitchen components are manufactured in the factory after design approval.
What happens:
- Cutting and fabrication
- Lamination or painting
- Door and drawer making
- Hardware fitting
Time required: 7–12 days
Delivery & Site Preparation (1–2 Days)
After manufacturing, the kitchen components are delivered to your home. The site is prepared for installation.
What happens:
Delivery of kitchen units
Wall cleaning and leveling
Plumbing and electrical preparation
Temporary removal of old kitchen (if any)
Time required: 1–2 days
Modular Kitchen Installation Time: Installation & Assembly (3–5 Days)
The actual installation includes assembling cabinets, fixing countertops, and installing hardware. This stage transforms the kitchen space into a functional modular kitchen.
What happens:
- Cabinet assembly
- Countertop installation
- Sink and hob fixing
- Chimney and appliance setup
- Final adjustments
Time required: 3–5 days
Finishing & Quality Check (1–2 Days)
The final step is finishing and quality checking. The installer ensures that everything is properly aligned and functioning.
What happens:
- Alignment check
- Door and drawer testing
- Final cleaning
- Customer walkthrough
Time required: 1–2 days
Total Modular Kitchen Installation Time (Approx.)
| Stage | Time Required |
|---|---|
| Measurement | 1–2 days |
| Design Finalization | 2–4 days |
| Manufacturing | 7–12 days |
| Delivery & Preparation | 1–2 days |
| Installation | 3–5 days |
| Finishing | 1–2 days |
Total Time: 15–27 days
This is the average modular kitchen installation time. The exact duration may vary depending on design complexity, material availability, and site conditions.
Tips to Reduce Modular Kitchen Installation Time
To complete your kitchen faster, consider:
- Finalizing design early
- Choosing standard materials
- Ensuring proper site preparation
- Avoiding last-minute changes
A professional team can help you reduce delays and complete the installation smoothly.
Why Choose Alexa Kitchen for Modular Kitchen Installation Time?
At Alexa Kitchen, we ensure a smooth and timely installation process. We provide:
- Expert measurement and design
- Fast manufacturing and delivery
- Professional installation
- Quality checks and after-sales support
👉 Contact Alexa Kitchen today for a hassle-free Modular Kitchen Installation.
